Las Vegas, Nevada
—————————————————————————-
47 Remodeled 5-Star Luxury Suites on the upper floor (29th) of the MGM Hotel and Casino, including the elevator lobby, reception and concierge space, 29th floor lobby, corridors etc.
Responsibilities: Managed the construction schedule, the general contractor, other specialty consultants, the interior designer, audio visual consultant and installer, appliance selections, including all furniture, fixtures and equipment, all audio visual equipment and all operating supplies and equipment
Role: Consultant to the MGM Hotel as BRADASH Consulting, Inc.